01Connected sooner
We connect where the power is.
Behind existing generators or onto spare industrial capacity, with no wait for new lines or major network upgrades.

The constraint
5.4GW
of large data centres in AEMO's connection queue, almost all in New South Wales and Victoria. None has reached commissioning.
2YEARS
average delay on the NEM's major transmission projects.
7.2TWh
of wind and solar switched off in 2025 at farms already connected to the grid, nearly double the year before.
The queue is for new connections and new builds. DAME starts where the connection already exists.
How DAME is different
01Connected sooner
Behind existing generators or onto spare industrial capacity, with no wait for new lines or major network upgrades.
02Modular
Halls are built and tested in a factory, then installed while the site is prepared. Every site is designed for Tier III, with N+1 power and cooling.
03Flexibility
Flexible compute and a storage layer of batteries and UPS. Together they take surplus wind and solar, then step back within seconds when the grid is tight.
04No water
Liquid cooling runs on a closed loop with no mains water draw, built for direct-to-chip AI racks.
05Heat re-used
Where there is demand nearby, heat from the loop warms greenhouses, timber kilns or food processing.
Track record
Who we work with
AI customersCapacity for AI computeHigh-density liquid cooling for the latest GPU servers, in sites designed for Tier III with N+1 power and cooling.AI hosting
Wind and solar ownersSell the energy you switch offWe build beside your farm and buy the energy that is being curtailed.Energy partners
Networks and regulatorsA load that responds to the marketA registered Market Participant in the NEM, with a flexible layer next to firm AI compute.Grid and policy Tell us the platform, the megawatts and when you need them.