Training
Large clusters that run for weeks.
- Deployment
- A dedicated hall or a full site, beside generation
- Cooling
- Liquid cooling at the highest density
Specification
Built to your requirements
Tell us the platform and the date. We match the site and size the hall.
Training
Fine-tuning and research
Inference
Modular delivery
Compute, cooling and power arrive as containerised pods, built and tested by suppliers such as Schneider Electric and Vertiv. Less work on site means AI capacity runs sooner, and more pods are added as demand grows.
Racks, cabling, piping, power and liquid cooling are fitted and tested before shipping, which cuts onsite work and delays.
Groundworks and the connection are prepared while the pods are built, so neither waits on the other.
Capacity is staged to your date. Hardware goes in last, so a late shipment never holds up the build.
How we deliver
Service scope
Every level includes the grid connection, contracted power, land, fibre access and room to expand. Choose how much of the rest DAME runs.
| Powered land | Colocation | Managed | |
|---|---|---|---|
| Building, critical power and liquid cooling | Customer | Included | Included |
| Remote hands, with a service level and credits | Optional | Included | Included |
| Ports, cross-connects, internet and dark fibre | Optional | Optional | Included |
| Monitoring portal and service level reporting | Customer | Included | Included |
| Servers, network fabric and storage, run to the OS | Customer | Customer | Included |
| GPU clusters and orchestration | Customer | Customer | Optional |
"Customer" means the customer provides it. GPU and server finance is available through our partners. Scope is confirmed per site and contract.
Where we build
2
Operational sites
535MW
In development, five sites
Locations on the map are approximate.
Operational
In development
Tell us the capacity and the timeline. DAME will identify the sites that can supply it.
Ask about capacity